How to read a partition type schedule for drywall estimating

By David Wright, Field24 · Updated

Short answer

Read a partition type schedule one row at a time: for each wall tag, write down the stud size and gauge, the board and layers on each side, insulation, the height (to deck or to ceiling), the fire rating and UL design, and the notes. Check it against the specifications, then build one takeoff line per type before measuring.

Learning how to read a partition type schedule for drywall estimating is learning to read the page that turns a floor plan full of wall tags into a priced takeoff. Every tag on the plans points to a row on it, and that row sets the studs, the board, the layers, the height and the rating. Read it wrong and every wall of that type is priced wrong. This guide reads a schedule the way an estimator does before bid day.

What is a partition type schedule?

A partition type schedule is the table on an architectural sheet that defines every interior wall type on the job: its tag, studs, board and layers on each side, insulation, height, fire rating and acoustic rating. The floor plans show where each wall runs; the schedule says what each one is built of.

01Find the schedule and the tags it serves

On most commercial sets the schedule sits on an early architectural sheet (often A0 or the first A-sheet of the floor plans) or on a dedicated partition sheet. It may be called a partition schedule, a wall-type legend or wall types and details. Each row has a tag, such as P1, A3 or 1A, and the same tag appears on the floor plans at every wall of that type.

Before you open the floor plans, list every tag on the schedule. Then walk the plans and note any tag that is drawn but not scheduled, or scheduled but never drawn. Either one is a question for the architect.

02Read every column of a row

A complete row answers seven questions. Write the answer to each one down for every type before you measure anything.

ColumnWhat it tells youWhat it changes in the takeoff
StudDepth, gauge and spacing, such as 3-5/8 in. 20 ga at 16 in. o.c.Stud and track counts, and the stud price
Board, each sideBoard type and thickness on side A and side BWhich board line the area goes to
LayersLayers on each sideBoard area: linear feet × height × layers × sides
InsulationSound batts or noneA separate insulation line by area
HeightTo deck, to 6 in. above ceiling, or to ceilingThe height you multiply by
RatingFire rating and UL design numberLayers, board type and head-of-wall joints
STC and notesAcoustic rating, sealant, special conditionsAcoustic sealant and other small lines

A row that leaves a column blank is not telling you "none". It is telling you to look somewhere else: the details, the specifications or a question to the architect.

03Treat height as part of the type

Height is where most schedule mistakes hide. "To deck" means the bottom of the floor or roof structure above. "6 in. above ceiling" stops short of the deck and usually needs bracing to the structure. "To ceiling" stops at the finished ceiling. The same tag can carry a different height on different floors, so take each height from the sections and the reflected ceiling plan, not from a single typical number.

If one type runs at two heights on the job, carry it as two takeoff lines. A single line with an average height cannot be checked and will not survive a change order.

04Check the schedule against the specifications

The schedule is a drawing, and the 09 21 16 gypsum board section and the 09 22 16 non-structural metal framing section of the specifications describe the same walls in words. When the two disagree, the instructions to bidders or the general conditions usually say which governs, and specifications commonly take precedence over drawings. Check at least these:

  • Stud gauge: the schedule says 25 ga, the spec requires 20 ga minimum at certain heights.
  • Board: the schedule says 5/8 in. Type X, the spec calls for abuse-resistant board in corridors.
  • Finish: the schedule is silent, the spec sets a Level 5 finish in some rooms.

Price what governs, and write the conflict and your assumption into your proposal.

05Build your takeoff lines from the schedule

Turn every row into one or more takeoff lines before you measure. Each line carries its tag, its height and the unit it is measured in. When you measure the floor plans, every wall then lands on a line that already knows its studs, board, layers and height, and the totals by type come out ready to price.

Worked example: four types on an office TI

A small office tenant improvement has four types on its schedule. The deck is at 13 ft 6 in. and the ceiling at 9 ft 6 in. Linear feet come from the floor plans; the numbers here are an example.

TagAssemblyHeightLFBoard (sq ft)Takeoff lines
P13-5/8 in. 25 ga studs, 1 layer 5/8 in. each side6 in. above ceiling (10 ft)4208,400Studs, track, board, bracing
P2P1 with sound battsTo deck (13 ft 6 in.)1504,050Studs, track, board, batts, acoustic sealant
P31-hour, UL design, 1 layer 5/8 in. Type X each sideTo deck (13 ft 6 in.)1804,860Studs, deflection track, Type X, head-of-wall joint
P4Furring, 7/8 in. hat channel, 1 layer 5/8 in. one sideTo ceiling (9 ft 6 in.)90855Hat channel, board

Four rows become about fifteen priced lines. P3 also needs the rated-wall takeoff: layers by UL design, Type X on its own line and head-of-wall joints in linear feet.

Worked example: a measured single-story clubhouse

The plan below is a single-story, wood-framed clubhouse, measured wall face by wall face. Its assembly schedule has seven wall types:

  • 01B, exterior walls: 1-hour, UL U356, rated from the inside, so only the inside face gets Type X.
  • 05A and 05B, fire barriers: 1-hour, UL U305.
  • 06A and 06B, standard partitions: not rated. A general note makes every untagged wall 06A.
  • 07A and 07B, wet walls: not rated, with moisture-resistant board.

Every wall takes one layer of 5/8 in. board. Ceilings are 9 ft 0 in., and 10 ft 9 in. in the foyer and open office. Rated walls run 1/2 in. past the ceiling line, to 9 ft 0-5/8 in., to stop below the bearing.

It opens on the whole building. Pick a room to see its walls and the sheets it takes: each row is one boarded face, so a partition shows up once in each room it faces, and door and window openings are already left out.

All rooms

Green: every wall face that gets drywall. Grey: faces that get none. Thin line: the building's outside. Pick a room on the plan, in the list or in the table.

Not counted, and why
  • Windows, storefront and doors: the glass and openings between wall piers, such as the Multi-Purpose room's west entrance and the windows along the south and east walls.
  • The outside face of exterior walls: siding and sheathing. Type 01B is rated from the inside, so only its inside face gets Type X.
  • Plumbing chases: the boxes between the restrooms, the chase between Mail & Package and Laundry, and the box in the Pantry are boarded from the rooms, not inside.
  • The package lockers in Mail & Package 124: equipment, not a wall.
  • The dryer wall between Laundry 123 and MEP 122: five stacked dryers fill it.
  • The gable ends above 9 ft in the Multi-Purpose room's vaulted ceiling, and every ceiling: walls only.
RoomFace (LF)Board (sq ft)Sheets, before waste
34.036510
21.32296
14.51314
12.31115
20.11816
39.43559
33.63039
37.13349
14.71324
15.41395
81.673618
15.01354
37.33369
30.62768
48.543711
47.843011
28.62588
17.11535
43.138910
71.764616
34.63118
17.01546
59.753813
66.760115
66.760016
29.92698
36.23258
6.5593
31.72857
Total1012.79219251

Whole building, walls only, 4 x 12 sheets with 10% waste

MethodType XMR Type XTotal
Square feet ÷ 4815755212
Hung room by room20671277

Ordering by square feet comes up 65 sheets (31%) short.

The sheet count hangs each room on its own: full 4 x 12 sheets in courses, the top course ripped from sheets shared across the room's walls, and the room's offcuts of 2 ft or more reused before a new sheet is opened. Square feet ÷ 48 assumes every offcut in the building is used somewhere, which no crew hanging room by room does.

Common mistakes reading a schedule

  • One height per type. The same tag can run to the deck on one floor and to the ceiling on another; take each height from the sections.
  • Treating an empty cell as "none". If the stud gauge or rating is blank, check the wall details, the specifications and the general notes, and if it is not there, ask the architect before you price it.
  • Trusting the schedule over the specifications. Check stud gauge, board type and finish level against 09 21 16 and 09 22 16 before pricing.
  • Missing tags. A tag on the plans with no row, or a row never drawn, is a question for the architect before bid day.
  • Missing a revised schedule in an addendum. Addenda often reissue the partition sheet; compare it row by row with the one you priced, and re-price only the types that changed.

Questions estimators ask

Where is the partition schedule on a set of drawings?
Usually on an early architectural sheet, such as A0 or the first floor-plan sheet, or on a dedicated partition sheet. It may be called a partition schedule, a wall-type legend or wall types and details.
What does "6 in. above ceiling" mean on a partition schedule?
The wall stops 6 in. above the finished ceiling instead of running to the deck. It usually needs bracing to the structure above, so it is a different height and a different takeoff line from the same wall run to the deck.
What if the schedule and the specifications disagree?
The instructions to bidders or the general conditions usually say which governs, and specifications commonly take precedence over drawings. Price what governs, and write the conflict and your assumption into your proposal.
What if a wall tag on the plans is not on the schedule?
Ask the architect before bid day. Until you have an answer, state in your proposal which type you priced it as, so the assumption is on paper if it changes.

Sources

  • Peterson & Dagostino, Estimating in Building Construction, 9th ed. (Pearson, 2019), §17-3 Types of Assemblies
  • Peterson & Dagostino, Estimating in Building Construction, 9th ed. (Pearson, 2019), §17-6 Estimating Drywall
  • Peterson & Dagostino, Estimating in Building Construction, 9th ed. (Pearson, 2019), §3-9 Specifications
  • Peterson & Dagostino, Estimating in Building Construction, 9th ed. (Pearson, 2019), §4-16 Errors and Omissions
  • CSI MasterFormat: 09 21 16 Gypsum Board Assemblies and 09 22 16 Non-Structural Metal Framing
  • ASTM C754, Standard Specification for Installation of Steel Framing Members to Receive Screw-Attached Gypsum Panel Products
  • ASTM C840, Standard Specification for Application and Finishing of Gypsum Board
  • UL Product iQ: fire-resistance design listings (BXUV)

Related guides