Short answer
A drywall subcontractor's scope of work names the drawings, specification sections and addenda you bid, then lists inclusions as work (framing, board by type, rated assemblies, finish levels by room) and exclusions by name, especially ceilings, framing by others, door supply, insulation, paint, demolition, firestopping and permits. Put assumptions, alternates and unit prices on their own lines.
A drywall subcontractor scope of work lists the inclusions and exclusions that become the subcontract. On a commercial job, whatever the scope leaves unclear, the GC will read in their favor after award, and the costliest gaps are at trade boundaries: ceilings, framing by others, doors and frames, insulation, paint, demolition and firestopping. This guide lists what a drywall and framing scope should say, item by item, and how to write it so it survives bid leveling.
What is a scope of work in a drywall bid?
The scope of work is the part of a bid that says exactly what the price covers: the documents it was priced from, the work included, the work excluded and the conditions it assumes. Once the bid is accepted, it is the basis of the subcontract between the GC and the drywall sub.
01Name the documents you bid
A scope is only as clear as the documents it points to. Open it with the project name, the architect, the drawing set and its date, the specification sections you priced and every addendum by number. When the drawings change after bid day, that list is what shows your price was for the earlier set.
Then name your sections: 09 21 16 gypsum board assemblies, 09 22 16 non-structural metal framing, and any others you carry, such as 09 51 00 acoustical ceilings or 07 21 00 sound insulation.
02Spell out the inclusions
Write inclusions as work, not as section numbers. A GC comparing three bids reads the list, not the spec book. A typical commercial interior scope includes:
- Metal stud framing for all partitions, furring and soffits on the partition schedule, with bracing to structure.
- Gypsum board by type, including Type X and any Type C, abuse-resistant and moisture-resistant board where scheduled.
- Rated assemblies per the UL designs on the drawings, run to the deck where required.
- Taping and finishing to the levels stated, room by room (for example, Level 4 typical, Level 5 at the lobby).
- Sound batts where scheduled.
- Installation of hollow metal door frames in stud walls, frames furnished by others.
- Blocking and backing where shown on the drawings.
- Layout from control lines provided by the GC.
03Spell out the exclusions
Exclusions are where a scope earns its keep. In the commercial drywall bids and GC scopes we see, the same handful of trade boundaries come up again and again, and the same item is excluded on one job and included on the next. So write each one from the documents in front of you, never from last job's list:
| Item | Where the boundary falls | How to word it |
|---|---|---|
| Acoustical ceilings | Grid and tile are often a separate ceiling trade, sometimes yours | ACT grid and tile included or excluded, by name |
| Framing by others | Wood framing, metal stud framing or ceiling framing can belong to another trade | Name what you frame: metal stud partitions included, wood framing by others |
| Doors, frames and hardware | Supply and installation are often split | Install HM frames furnished by others; doors, hardware and storefront excluded |
| Insulation | Sound batts, mineral wool and spray foam are different scopes | Sound batts where scheduled included; spray foam and rigid insulation excluded |
| Paint and primer | Primer on new board is easy to assume | Painting, primer and wall coverings excluded, or included by area |
| Demolition | Existing walls and ceilings in a TI | Demolition excluded, or included only where shown for your scope |
| Firestopping | Head-of-wall joints and penetrations are often split between trades | Head-of-wall joints at rated walls included; penetrations by the trade installing through |
| MEP and specialties | Work inside your walls is not your work | Electrical, plumbing, HVAC, fire protection and low-voltage excluded |
| Permits and fees | Permit, engineering and inspection fees | Permit, engineering and inspection fees excluded unless requested in writing |
Add the rest in one line each where they apply: patching of existing finishes, hoisting, lifts above a stated height, temporary heat, bonds, after-hours and premium time, and anything not shown on the documents you named.
04State the special conditions and assumptions
Write down every assumption your price depends on: the number of mobilizations, the working hours, the schedule duration, the finish levels, the deck height you used where the drawings did not give it, and any conflict between the drawings and the specifications with the one you priced. A GC can only hold you to a scope they can read, and you can only defend a price whose assumptions are written.
05Price alternates and unit prices on their own lines
Alternates (add or deduct) and unit prices (per square foot of patch-back, per added door frame) go on separate lines, never folded into the base bid. A GC leveling bids compares base bids first, and an alternate mixed into yours makes it look high.
06Track addenda and changes after bid day
Most bid packages pick up addenda, and a missed one can make a bid non-responsive even when it changes nothing you price. Before you submit, confirm with the architect or GC how many addenda were issued, and list each by number on the bid form and in your scope.
After award, a change to the drawings is a change order, not a new bid. Price only the lines the revision touches, the difference between the old and new quantities, and name the revised sheets and their dates. A scope that says later addenda and revised drawings are excluded unless incorporated in writing gives you the footing to do that.
Worked example: a scope for a two-floor office fit-out
A short scope for a two-floor office tenant improvement might read:
| Part | Text |
|---|---|
| Documents | Drawings A0.1 to A6.2 dated 03/14, specifications 09 21 16 and 09 22 16, addenda 1 and 2 |
| Inclusions | Metal stud framing, board and finish for partition types P1 to P6; Level 4 typical, Level 5 at reception; rated walls to deck with head-of-wall joints; install HM frames furnished by others |
| Exclusions | ACT grid and tile; doors and hardware; spray foam; painting and primer; demolition; firestopping of penetrations; MEP; permits and fees |
| Assumptions | Two mobilizations; day shift, Monday to Friday; deck at 13 ft 6 in. where not dimensioned; later addenda excluded unless incorporated in writing |
| Alternates and unit prices | Alt 1 deduct: Level 4 at reception; patch-back at $X per hour |
Each line is something a GC can check against the other bids, which is what the next step of the bid is.
Common mistakes in a drywall scope
- "By others" with no name. Say which trade, or say excluded; "by others" invites the GC to decide later.
- Copying last job's exclusions. The same item flips between jobs; write the list from these documents.
- No document list. Without the drawing date and addenda, a revised set has nothing to be measured against.
- Furnish and install in one word. "Doors included" can mean supply, install or both; say which.
- Finish levels left out. "Tape and finish" lets the GC expect Level 5 wherever the specs are unclear.
- Re-bidding every change. Price the lines a revision touches, not the whole job again.
Questions estimators ask
- What should a drywall subcontractor exclude?
- Anything you have not priced, by name. The trade boundaries that come up most are acoustical ceilings, framing by others, door and frame supply, insulation, paint and primer, demolition, firestopping of penetrations, MEP work, and permit and engineering fees. The same item can be yours on one job and not the next, so write the list from the documents.
- Is firestopping in the drywall scope?
- It depends on the job's scope split. Head-of-wall joints at rated walls are often the drywall sub's, while penetrations often go to a firestop subcontractor. Say exactly which parts you carry.
- Should finish levels be in the scope of work?
- Yes, room by room. Level 4 and Level 5 are priced very differently, and a scope that says only "tape and finish" lets the GC expect Level 5 wherever the specifications are unclear.
- Why list the drawings and addenda in a scope?
- So your price is tied to the set you bid. When the drawings change after bid day, the dated list shows which version you priced, which supports a change order.
Sources
- Peterson & Dagostino, Estimating in Building Construction, 9th ed. (Pearson, 2019), §9-3 Writing a Scope of Work
- Peterson & Dagostino, Estimating in Building Construction, 9th ed. (Pearson, 2019), §3-10 Alternates
- Peterson & Dagostino, Estimating in Building Construction, 9th ed. (Pearson, 2019), §3-11 Addenda
- Peterson & Dagostino, Estimating in Building Construction, 9th ed. (Pearson, 2019), §6-6 Checklist
- CSI MasterFormat: Division 09 Finishes