Drywall bid template for commercial jobs: what it must hold

By David Wright, Field24 · Updated

Short answer

A commercial drywall bid template has a project header with the drawing date and addenda, one workup line per wall type (LF, height, layers, board area, sheets, studs, track, material and labor apart), sections for ceilings and general conditions, a summary sheet with overhead and profit, and a proposal page stating inclusions, exclusions and alternates.

A drywall bid template for commercial work has to do more than most do. Most are a single sheet with a square-foot price and a markup. That is a quote, not a bid. A commercial drywall bid template is built from the takeoff up: one workup line per wall type, material and labor priced apart, general conditions on their own, then a summary and a proposal page that states the scope. This guide lays out each part and what it must hold.

What is a drywall bid template?

A drywall bid template is a reusable set of sheets that takes a takeoff to a submitted price: workup sheets that turn quantities into material and labor cost, a summary sheet that adds them up with overhead and profit, and a proposal page the GC reads.

01Start with the project header

The first block identifies what you are pricing, so nobody can confuse this bid with the last revision:

  • Project name and location, owner and GC
  • Architect, the drawing set and its date, and the addenda received, by number
  • Bid date and time, estimator, and the date the sheet was last worked on
  • Sheet numbers on every page, written as "1 of 6", so a missing sheet is noticed

02Build one workup line per wall type

The workup sheet is where the takeoff becomes cost. Give every partition type on the schedule its own line (or several, when one type runs at different heights), with these columns:

ColumnWhat goes in it
Tag and descriptionP3, 1-hour, 3-5/8 in. 20 ga, 1 layer 5/8 in. Type X each side
LF and heightFrom the floor plans and the sections
Layers and sidesFrom the schedule and the UL design
Board areaLF × height × layers × sides
Sheets with wasteSheets counted per wall from length, height, sheet size and direction, plus your waste factor, by board type
Studs and trackCounted from LF, spacing and height
AccessoriesBead, trim, control joints, head-of-wall joints, sealant
Material costQuantities × your current supplier prices
Labor hours and costQuantities × your production rates × burdened wage

Keep material and labor in separate columns. Material prices stay steady across a job; labor changes with height, layers and access, and a template that blends them cannot be checked.

03Add ceilings, extras and general conditions

Below the wall types, add sections for drywall ceilings and soffits, acoustical ceilings if you carry them, and small lines that are easy to forget: access panel and frame installation, blocking where it is yours, and finish level upgrades by room.

Then give general conditions their own section: supervision, hoisting and stocking, lifts and scaffolding, cleanup and dumpsters, small tools, mobilizations, temporary protection, and permits or bonds if they are yours. These are real costs and they belong in the bid as lines, not as a padded markup.

04Roll it up on a summary sheet

The summary sheet condenses every workup sheet into one page: material, labor, equipment and general conditions by section, then overhead and profit. List only the totals. The calculations stay on the workup sheets, where someone checking the bid can follow each one.

05Protect the template from its own errors

Spreadsheet templates fail in quiet ways. Lock every formula cell, so a typed number cannot overwrite a calculation. Check that a line added to a section is inside that section's total. Never retype a number from one sheet to another: link it. A misplaced decimal is still the most common estimating error, so have someone else check the totals before the bid goes out.

06Re-price changes without starting over

Addenda before bid day and revisions after award are where templates lose the most time. Keep a revision log in the header: each addendum or revised sheet by number and date, the workup lines it changed and the difference in cost. Because every wall type is its own line, a revised type changes its own line and nothing else, and a change order is the difference between the old and new lines plus your markup.

07Finish with the proposal page

The last page is what the GC reads: the documents you bid, the inclusions and exclusions, the assumptions, the alternates and unit prices on their own lines, and the price. Write it in the order of the GC's bid package so it lines up with their leveling sheet.

Field24's proposal library has a default proposal design and several others, and Field24 fills the one you pick from your takeoff and priced estimate, so the proposal page is not retyped for every bid.

Worked example: one wall type through the template

Partition type P3 on an office TI: 180 LF of 1-hour wall in six 30 ft walls, 13 ft 6 in. to the deck, one layer of 5/8 in. Type X each side, 3-5/8 in. 20 ga studs at 16 in. on center. The waste factor and the counts are an example.

ColumnValue
Board area180 × 13.5 × 1 × 2 = 4,860 sq ft
Sheets by layout4 x 14 hung vertically: 8 per wall side × 6 walls × 2 sides = 96
Sheets with 10% waste96 × 1.10 = 106 sheets of 4 x 14 Type X
Studs, 14 ft180 LF × 0.75 per LF, plus 1 per wall end: about 135 + ends
TrackBottom track 180 LF, deflection track 180 LF at the deck
Head-of-wall joint180 LF, listed system
Material and laborEach priced from the quantities above, in their own columns

Every other wall type gets the same line, and the summary sheet adds them up. When a GC asks why your number differs from another bid, the answer is on the workup sheet.

Common mistakes in drywall bid templates

  • Ordering by square feet. Area ÷ 48 plus waste ignores sheet length and layout, and leaves you short with offcuts you cannot use; count sheets per wall.
  • Material and labor in one number. Neither can be checked or repriced on its own.
  • General conditions hidden in the markup. They change job to job; carry them as lines.
  • Retyping numbers between sheets. Every retyped number is a chance for a transfer error; link them.
  • No drawing date or addenda in the header. Without them, a revised set cannot be priced as a change.
  • Re-doing the whole estimate for a small change. Change the lines the revision touches and log the difference.

Questions estimators ask

What should a drywall bid template include?
A project header, a workup line for every partition type with quantities, material and labor in separate columns, ceilings and extras, general conditions as their own lines, a summary sheet with overhead and profit, and a proposal page with the scope.
Why keep material and labor in separate columns?
Material prices stay fairly steady across a job, while labor changes with wall height, layers and access. Keeping them apart lets you and the GC check each one, and lets you reprice one without touching the other.
Should general conditions be a markup or line items?
Line items. Supervision, hoisting, lifts, cleanup, mobilizations and protection are real costs that change from job to job. As lines they can be checked and defended; hidden in a markup they cannot.
How do I avoid errors in a spreadsheet bid template?
Lock every formula cell, check that new lines fall inside their section's totals, link numbers between sheets instead of retyping them, and have someone else check the totals before the bid goes out.

Sources

  • Peterson & Dagostino, Estimating in Building Construction, 9th ed. (Pearson, 2019), §4-14 Workup Sheets
  • Peterson & Dagostino, Estimating in Building Construction, 9th ed. (Pearson, 2019), §4-15 Summary Sheet
  • Peterson & Dagostino, Estimating in Building Construction, 9th ed. (Pearson, 2019), §4-16 Errors and Omissions
  • Peterson & Dagostino, Estimating in Building Construction, 9th ed. (Pearson, 2019), §5-3 Spreadsheets
  • Peterson & Dagostino, Estimating in Building Construction, 9th ed. (Pearson, 2019), §17-6 Estimating Drywall